Glass soap box installation standard
Oct 10, 2024
Leave a message
The installation standard of glass soap box mainly includes the following steps and precautions:
Prepare materials:
8mm hard optical axis, 400mm long, 4 pieces; 380mm long, 6 pieces.
Optical axis open type fixing ring, SCSAW8 model, inner diameter 8mm, outer diameter 25mm, thickness 10mm, a total of 12 pieces.
Optical axis cross fixing clamp, same diameter 8*8mm, quantity 12 pieces.
Single-sided transparent frosted acrylic sheet, 400x150mm, 3 pieces.
Installation steps:
Determine the position of the shelf and mark it: Mark the wall according to the location where it needs to be installed.
Use the optical axis and fixing ring to assemble the shelf frame: Assemble the optical axis and fixing ring into a frame structure.
Install the acrylic sheet: Cut the acrylic sheet to the appropriate size and install it on the frame.
Adjust the shelf to a horizontal position: Ensure that the shelf is installed horizontally and adjusted to the best state.
How to install a punch-free soap box:
Choose the right soap box and color and size: Choose the right punch-free soap box and make sure its color and size match the installation environment.
Clean the installation site: Wipe the installation site with a dry cloth to ensure that the tiles are clean and tidy.
Install the buckle: Press the buckle on the wall to determine the installation position.
Paste the soap box: Tear off the film of the adhesive buckle, press to expel the air, and ensure that the soap box is firmly attached to the wall.
Wait for drying: Wait for 24 hours to ensure that the adhesive buckle is completely dry.
Install the soap box: Put the soap box completely on the adhesive buckle and put soap on it for testing.
